Skip to Main Content
  • Language: English
    • Čeština Čeština
    • English English
    • Русский Русский
    • Español Español
Strojírny Brno
  • Home
  • News
  • Company Product Portfolio
    • Water turbines
      • Kaplan Turbines
      • Francis Turbines
      • Pelton Turbines
    • Hydro-Mechanical Equipment
    • Upgrading and uprating
  • References
  • Engineering
  • Downloads
  • Contact
  • Home
  • News
  • Company Product Portfolio
    • Water turbines
      • Kaplan Turbines
      • Francis Turbines
      • Pelton Turbines
    • Hydro-Mechanical Equipment
    • Upgrading and uprating
  • References
  • Engineering
  • Downloads
  • Contact

kaplan

28 Apr 2021

HPP Rätan, Sweden – Refurbishment of turbine G2

by David Ondroušek | posted in: Novinky | 0

We have started implementation of a project for the refurbishment of the G2 turbine unit, HPP Rätan in Sweden.
The power plant, put into operation in 1968, currently operated by UNIPER, is equipped with 2 Francis turbines – each with an output of about 30 MW and runner diameter of 2700 mm.

kaplan, Švédsko

(Čeština)

icon-car.png
 

loading map – please wait…

 
49.314555, 16.536548

Contact:

Strojírny Brno, a.s.
Blanenská 1278/55
664 34 Kuřim
Czech Republic

E-mail: strojirnybrno@strojirnybrno.cz

ID: 25543512
DIC: CZ25543512

The company is registered in the commercial register of the Regional Court in Brno, Section B, Entry 2778

  • Mapa stránek
  • Politiky

© 2023 Strojírny Brno